How is the shingle grade chosen?
By the roof's pitch, its exposure to wind and sun and the look that suits the house, not by the label alone.
A steep, sun-facing slope takes more heat and loses more granules than a shaded north face, and the grade is chosen to suit the harshest exposure on the roof. The layered profile of an architectural shingle handles that better than a thin single-layer product, and it sits more naturally on the older houses in the area.
The roofer should show samples on the actual roof and explain the difference in writing. A grade that looks right in a showroom can look wrong on a particular house once the new roof is down.
Why does the eave need a membrane?
The eave is where meltwater backs up, refreezes and forces its way under the first courses. A self-adhering membrane there seals the nail holes and blocks water that gets past the shingle edge.
Felt alone is not enough at the eave in a New Hampshire winter, because backed-up water is pushed sideways and upward under the lowest shingles. The city's guidance calls for this protection on the first three feet of a tear-off, and it is the detail most worth checking before the new roof goes on.
The membrane has to be pressed firmly to the deck and lapped correctly with the drip edge, or it does little. Its edges are the first places a roofer checks.
What nailing and exposure should the roof have?
The nails must sit where the shingle expects them, and the exposure must stay consistent, or the seal and the wind resistance suffer.
Nails placed above the cut-out line hold the shingle without interfering with the tab seal, while a nail set too high or too low causes lifting later. The exposure, meaning the part of each course left visible, is kept even from course to course so the joints stay staggered.
A roofer who nails by eye instead of by the line leaves a roof that looks fine for a few years and then begins to lift. The check is simple, and it is done before the crew leaves the roof.
Can asphalt shingle go on in cold weather?
Yes, with care. The adhesive strips in the shingle need warmth to seal, so a cold roof is sealed by hand or left to seal when the weather softens.
Shingles laid in hard frost can crack when bent, and the adhesive strip will not bond until the temperature rises. A roofer hand-seals the courses that need it and checks the tabs in a warmer spell, so no tab is left unsealed on the first windy night.
The timing of winter work is agreed with the homeowner, and the crew does not rush cold work to meet a date.
Which local rules apply to a shingle job?
The city's residential guidance is the starting point, and the Nashua building department settles what applies to a particular house.
The city's guidance treats a one- or two-family re-roof as not needing a permit, though the code still applies, and third-party guides say a permit is needed. Because those sources conflict, the answer for a given house has to come from the building department rather than from a guide.
A roofer working to the local code shows the eave and underlayment details before the job is closed and keeps a record of what was installed where. The Nashua roof permit guide lists the questions to bring to the department.