Tear-off to the deck
The full covering comes off, the deck is inspected and repaired, and fresh underlayment goes down before the new roofing. It takes longer on the day, but it is the only way to see the whole deck and fix what is wrong with it.
A whole roof comes off and is rebuilt when wear runs across every plane, not just one corner of it.
Fastest: call (833) 751-2102. Or send this and we call you back.
Roof replacement strips the existing covering back to the deck, checks and repairs the sheathing, then installs new underlayment, flashing and roofing. In Nashua, where many houses were built before 1970, the decision usually turns on how many layers are already up and how far the wear has spread across the slopes.
Most roofs in Nashua do not fail in one dramatic event. They wear across every slope: the granules thin, the nail heads lift and the flashing loosens a little more each winter, until a repair stops being a sensible answer. A replacement is then less about one broken spot and more about giving the house a sound covering for the next two or three decades, and that is worth deciding with the whole roof in view.
The age of the housing is a reason to look closely. The City of Nashua's 2020 housing study found about 60 percent of the city's homes were built before 1970, so many roofs here are on their second or third cycle. Each earlier cycle leaves something behind: a layer that was never removed, sheathing that was never checked, or a valley lined with metal that no longer suits the slope. A replacement is the moment those things are found and dealt with.
Nashua Roofing plans the work around the particular house rather than a template. The pitch, the number of layers, the lot, and the condition of the framing all change the plan, and the sections below explain how each one does. Nothing is torn off until the scope has been written and agreed.
A full replacement is the one job on a house where a homeowner should not attempt the work. The pitch is steep, the old material is heavy and the deck can give way under a person. Do not strip a few courses to see what is underneath, because that exposes the house to rain on the day. Keep children and pets clear of the drop zone, and call (833) 751-2102 to arrange a site visit before any decision is made.
The full covering comes off, the deck is inspected and repaired, and fresh underlayment goes down before the new roofing. It takes longer on the day, but it is the only way to see the whole deck and fix what is wrong with it.
Where the house has one layer of shingle in sound condition, the city's residential guidance allows a new layer to be roofed over. The approach leaves less debris, but it hides the deck, so it suits roofs where the boards are known to be sound before the work begins.
Where rafters or ridge boards have sagged, or were cut for an old dormer and never properly supported, the job includes structural repair before any roofing goes on. This comes up often in the older houses near the mill district, where framing was altered over the years.
A roof with several valleys, dormers and a steep pitch takes more time, more fall protection and more careful flashing. The number of junctions is what sets the difficulty, so a plan that lists every one avoids surprises on the day.
Tell us when you need someone and we book the earliest visit a roof replacement technician has, and you approve the price before any work starts.
A roof is usually past repair when the wear is general rather than local, and when the repairs have started to cluster around the same few areas.
Shingles that have lost their protective surface across most of the roof, that crack when a tab is lifted, or that curl at the edges are at the end of their service life. A single broken shingle does not say that, but three leaks in one year on different slopes, each traced to a different failure, usually does.
Age is a guide, not a verdict. A roof can have many years in it and still be sound, while a newer covering can fail early because of poor ventilation or a weak installation. The condition of the underlayment, the flashing and the deck tells you more than the age of the house does.
Not always, but a tear-off is the only way to see the deck, and it is the right choice when the old covering is failing or when layers are stacked.
The City of Nashua's residential guidance allows one existing layer to be covered where it is in sound shape, which saves debris and time. The trade-off is that the deck stays hidden, so any rot underneath is found later, sometimes by a leak showing up in a ceiling.
A tear-off takes longer on the day, but it lets the crew replace bad boards before the new covering goes on. Where the deck is known to be sound, an overlay can be a fair choice. Where it is not, the roofer should say so and recommend the tear-off.
Area and pitch, the number of layers, the state of the deck, access and the number of junctions all change the scope of work, and each one is written down before work starts.
A simple gable with one slope and clear access is the easiest version of the work. A hip roof with dormers, a chimney and two valleys has more places where water must be turned, more flashing to set and more lift needed to get material up. Each of those is named in the written scope, so the agreed work matches the actual house.
Access is part of it. A lot where the crew can only reach the eave by ladder, or where a porch roof sits below the main slope, changes how material is raised and how debris is carried away. A roofer who has seen the site writes those conditions into the plan before the day is booked.
It can, with extra care. Snow and ice have to come off the work area, and the new covering has to be sealed properly as the temperature allows.
Sealant strips do not bond well in a hard frost, so a crew may hand-seal the courses and return for a fuller seal later. Working on a frozen deck is slower and riskier, and a roofer will often schedule the bulk of the tear-off for a milder stretch of weather.
The decision in a New Hampshire winter is about timing rather than possibility. A careful crew will not rush a seal in the cold just to meet a date, because a rushed seal is the leak that shows up after the first thaw.
The City of Nashua's guidance sets the baseline for re-roofing a one- or two-family home, but the code and the rules are a matter for the building department.
The City's residential re-roof guidance says no permit is required for a one- or two-family home, but the work must still follow the code. A tear-off needs water and ice protection at the eaves and a minimum weight of felt elsewhere on the roof. Third-party guides disagree about whether a permit is needed.
Because the sources conflict, the sensible step is to ask the Nashua building department before the work is booked. A roofer who knows the local code will say what applies to your house, and the Nashua roof permit guide sets out the questions worth asking.
The first visit records the number of slopes, the pitch, the overhangs and how the crew will reach the eave. Pitch decides how the work is staged and how steep the walk is, and access decides where the debris can go, which matters on a narrow lot.
The roofer counts the layers already on the house, usually from the eave or from a small cut at the edge of a valley. Where the deck can be seen from the attic, rot and sagging are checked from below, because the sheathing decides whether the new covering can be fixed properly.
The written scope names the underlayment, the flashing, the ventilation and the roofing, and says how the ground and the neighbors' property will be protected. Where the house sits close to the street, the plan explains how debris will be lowered and how the sidewalk will be kept clear.
The old covering comes off to the deck, and each rotten board is cut back to the nearest framing and replaced. Nothing new goes down over soft wood. The deck is swept of nails before the underlayment is laid, so nothing punctures the new membrane.
Underlayment is lapped so water runs over each joint, flashing is set at every junction, and the roofing is fixed to the pattern its material calls for. A magnetic sweep of the yard picks up stray nails, and the gutters are cleared before the crew leaves.
Older neighborhoods in Nashua put special demands on replacement. In the Tree Streets most of the houses date from before 1900 and stand within ten feet of the street, so the crew has to plan staging, debris and lowering with that sidewalk in mind before anyone climbs. The same tight lots turn up along the Nashua River mill district, where the rear of a house can barely be reached.
Across the line in the Massachusetts towns such as Pepperell, Dracut and Lowell, and in Hudson and Litchfield on the Merrimack, roofs range from farmhouse pitches to newer subdivisions. For the Massachusetts towns, the state's Office of Consumer Affairs and Business Regulation registers home improvement contractors, and the Massachusetts towns guide sets out what that means in practice.
Heavy winter snow is the other local factor. The ground snow load for Nashua is roughly 50 to 60 pounds per square foot, sources differ, and that spread shapes how the framing and the deck are checked before a new covering goes on. The snow load guide explains where the figures come from.
Not sure if you're covered? Check your ZIP code.
The failed section is found, scoped and rebuilt, so sound roof is left in place instead of being stripped.
Most houses here are re-covered in asphalt shingle, and the choice turns on the grade, the underlayment and the eave details.
Balanced intake and exhaust keep the roof deck cold, so snow does not melt above the eave and refreeze there.
Metal panels shed snow and last well, but they need careful eave, valley and fastening detail to perform in a New Hampshire winter.
This page prints no price, because no New Hampshire figure for roof replacement was verified and a number taken from elsewhere describes a different house.
The City of Nashua's own FAQ says no permit is required to re-roof a one- or two-family home, but the code must still be followed.
Several sources say New Hampshire has no statewide roofing license.
Several towns on the Massachusetts side of the Merrimack and Nashua Rivers sit within about 22 kilometers of Nashua, including Tyngsborough, Dunstable, Dracut, Lowell and Westford.
A simple single-slope house can be stripped and recovered in a few days of good weather, while a complex roof with dormers and several valleys takes longer. Weather is the main variable, and the crew will state the expected number of working days when the scope is written.
Only if the existing covering is a single layer in sound condition and the building code allows it. The City's guidance permits a single existing layer to be covered, but a second layer adds weight and hides the deck. Where either condition is doubtful, the roof is taken back to the deck.
Rotten sheathing is cut back to sound wood and replaced, and the new panel is fixed down to the framing. The written scope should say in advance how this will be handled, so it is not a surprise on the day. Rot that has reached a rafter is a structural matter and is reviewed before the work continues.
It helps. The crew needs access to the yard, to outdoor power and, if the deck is checked from below, to the attic. Someone should be on hand to move vehicles, decide what is stored near the house and answer questions as the work progresses.
It is a good time to look at them. Shingles tear and gutters often come loose during a tear-off, and any trough that holds water or sags is better fixed with the roof than afterward. The gutter and downspout repair page covers what to check.
Ask how debris will be contained, how the sidewalk and the lawn will be covered, and how stray nails will be cleaned up. The answers should be written into the scope. The New Hampshire roofer registration guide covers what is known about state registration, which is a separate question from the protection plan.