The City of Nashua's own FAQ says no permit is required to re-roof a one- or two-family home, but the code must still be followed. Third-party guides say a permit is needed, so the sources conflict. The reliable step is to ask the Nashua building department about your own address before any work begins.
Key takeaways
- The city's FAQ says a one- or two-family home can be re-roofed without a permit, provided the code is followed.
- The same FAQ allows a single existing shingle layer to be roofed over, while a tear-off has its own requirements.
- A tear-off requires water and ice shield on the first three feet and a minimum weight of felt elsewhere, according to the city.
- Third-party guides say a permit is required, and the sources conflict, so the building department is the authority to ask.
- Structural changes, new dormers and changes to framing sit outside a simple re-cover and should be raised separately.
- Keeping a written record of the scope, the materials and the inspection is useful whatever the permit answer turns out to be.
What does the City of Nashua's FAQ say?
The city's FAQ says a one- or two-family home can be re-roofed without a permit, but the work must still meet the building code.
The City of Nashua publishes a frequently asked questions document on residential roofing. It says that no permit is required to re-roof a one- or two-family home, and it adds that the code must be followed whether or not a permit is pulled. That is the city's own position, and it is the first thing to read before deciding anything else.
The same document allows a single existing layer of shingles to be roofed over, which means a homeowner is not automatically required to strip the old covering before a new one goes down. Roofing over is a legitimate route on the right house, but it leaves the decking unseen, so the choice should be made deliberately and recorded in the scope.
The FAQ is written for the homeowner and reads as plain guidance. It does not replace the building code or the department's own determination for a given address, and it does not cover every case, which is why the question should be put to the department directly.
What does the city say about a tear-off?
A tear-off needs water and ice shield on the first three feet from the edge and a minimum weight of felt over the rest of the deck.
When the old covering comes off, the city's guidance sets out what goes back on. Water and ice shield should be applied on the first three feet of the roof measured from the edge, which is the zone where meltwater backs up in winter. Across the remainder of the deck, a minimum weight of felt underlayment is required by the same guidance.
These are minimums, and the crew that does the work should be able to show what it installed at each point. Photographs taken before the new covering goes on are the simplest way to document that the eave was protected and that the felt met the stated weight. A scope that names these items shows the roofer knows the requirement.
The tear-off requirements apply whether or not a permit is pulled. A homeowner who wants to check the work can ask to see the underlayment at the eave before it is covered, and can ask for a photograph of the decking if the boards were replaced.
The tear-off rules are short, and they read differently in a summary than in the city's own words. Read the requirement as the city wrote it before a crew is booked, and ask the roofer to show where the eave protection and the underlayment sit on the scope. A roofer who has read the rule will know where each item goes without being prompted, and one who has to look it up should be asked to confirm it in writing.
Why do the sources disagree?
Third-party guides that describe a permit requirement and the city's own FAQ describe different situations, and neither can be taken as the final word for a given house.
Several third-party guides say that a re-roof in Nashua requires a permit, and some attach a fee to it. The city's FAQ says the opposite for one- and two-family homes. The sources conflict, and the conflict is not resolved by choosing the more convenient one. The guides may describe a general rule from elsewhere, an older version of the local requirement, or a different type of job.
A permit question can also turn on details that a general guide cannot see: the number of units, whether the work changes the framing, whether a dormer or a new opening is involved, and whether the building is used in a way that falls under a different category. The building department is the body that applies the code to the address, so its answer is the one that governs the job.
For that reason this page prints no fee and no threshold. A figure from a third-party guide cannot be checked against the city, and a homeowner who relies on one may pay for a permit they did not need or skip one they did.
A short list of questions, asked in the same order each time, makes answers easier to compare when two departments or two roofers are involved. Start with the address, then the scope, then the permit, then the inspection. Note the name of each person who answers and the date of the call, so the record can be checked against what the roofer later says.
What should I ask the building department?
Ask whether a permit is needed for your address and scope, what the tear-off requirements are and whether an inspection follows.
Give the department the address, the number of units, the type of covering on the roof now and the work planned. Describe whether it is a re-cover or a full tear-off, and whether any framing, dormer, skylight or chimney work is included. The department can then answer for that specific job rather than for roofing in general.
Ask whether an inspection is required and, if so, when it happens relative to the covering. An inspection before the new covering goes on can check the decking and the underlayment, and it is far easier to arrange at that stage than after the job is finished. Ask who applies for any permit, and whether that person is the homeowner or the roofer.
Write the answers down with the date and the name of the person who gave them. A written record is useful if a later question comes up about the work, and it gives a second roofer something to check against when they are asked to quote the same house.
Structural questions also need a written description of what is already there. Note the rafter size and spacing if they are known, the decking type and any earlier repair to the framing. The department and the roofer will both need that starting point, and it is far easier to gather before the design is fixed than after the crew has started.
When does a roof job go beyond a simple re-cover?
Structural work, new openings and changes to the roof shape are separate questions, and they should be raised with the department before any design is fixed.
A re-cover over a single layer is the simplest case. A tear-off changes the work but not the structure, and the requirements for it are set out in the city guidance. Work that alters the framing, adds a dormer or changes the pitch of a plane is a different matter, and it is usually reviewed as structural work.
Adding a skylight, enlarging an opening or cutting a new vent through the roof affects both the framing and the flashing. Each of those should be discussed with the department early, because the design load and the detail at the opening are part of what is reviewed.
A roof that carries snow load in a particular pattern may also need a structural check if the change adds weight, and the design figure for the ground load should be confirmed for the address. The safest approach is to raise the full scope with the department before the crew begins.
Photographs taken from the same spot before and after each stage are a useful record even when no permit is pulled. They show the condition of the decking and the eave at the moment the covering went over it. Date each photograph and name the place it was taken from, so a later visit can find the same point and compare.
What records should a homeowner keep?
Keep the written scope, the list of materials, the photographs taken during the work and any inspection notes.
A written scope that names the decking allowance, the underlayment, the flashing and the disposal gives a record of what was agreed. Keep it with the photographs of the decking, the eave protection and the finished roof, labeled with the date and the address.
Inspection notes, whether from the department or from a private visit, should be kept with the scope. If the house is sold or the roof has a later problem, those records show what was done, when and by whom, and they make the next visit faster.
Ask for copies rather than originals where possible, and keep them somewhere other than the attic. A roof record kept in an attic that later floods is not much use to anyone.
Frequently asked questions
Does a re-roof in Nashua need a permit?
The city's FAQ says no permit is required for a one- or two-family home, but third-party guides say one is needed. The sources conflict, so ask the Nashua building department about your address before work starts.
Can one layer of shingles be roofed over?
The city's FAQ allows a single existing shingle layer to be roofed over, provided the code is followed. Whether that is the right approach for a given roof is a separate question that depends on the decking.
Who pulls the permit if one is needed?
That depends on the job and on the department's practice. Ask the building department when you call, and ask the roofer which party they will apply through before a contract is signed.
Does this page give the permit fee?
No. The sources that mention a fee disagree with the city's own guidance, and no fee was verified. Ask the building department for the current figure and the rule that applies to your scope.
This guide is general information for Hillsborough County homeowners, not a substitute for an on-site inspection. Prices are estimates. See our disclaimer.